banner
Product
  • Phone

    86-0531-69925691

  • Address

    Rm. 2-2-402, Huixiangyuan Plot, Jiangshuiquan Road, Lixia Dist., Jinan, Shandong, China (Mainland)

  • E-mail

    k@waimaotong.com

LatestProducts
Three component solvent-free epoxy resin grout modern epoxy grouting materials

Three component solvent-free epoxy resin grout modern epoxy grouting materials

Three component solvent-free epoxy resin grout modern epoxy grouting materials, US $ 1 - 2 / Ton, 38245000, Grouting materials, C6H7NO2.Source from Jinan Biaoyuan Construction Material Co., Ltd. on Waimaotong.com.

Description

Overview
Quick Details
CAS No.:
38245000
Other Names:
Grouting materials
MF:
C6H7NO2
EINECS No.:
38245000
Place of Origin:
Shandong, China
Classification:
Other Adhesives
Main Raw Material:
Epoxy
Usage:
Construction, Transportation
Brand Name:
BiaoYuan
Model Number:
BYER100
Type:
Two Component
Supply Ability
Supply Ability:
100 Ton/Tons per Day
Packaging & Delivery
Packaging Details
20kg/barrels
Port
Qingdao,Tianjin
Lead Time :
Shipped in 5 days after payment

Three component solvent-free epoxy resin grout modern epoxy grouting materials 

Introduction:

A:Epoxy grout is long- term needs of secondary grouting equipment to withstand vibration, shock and chemical corrosion zones installed to provide a permanent solution ,
it has been constantly proven to greatly extend the operation period and the movable parts of the equipment life.
B:Including A ( resin ), B ( hardener ), C ( filler ) three components , the product of high quality resin and filler refined , high solid content , solvent and other volatile harmful substances.
At room temperature in each set of three component material thoroughly mixed immediately after use , without adding any additional ingredients .
Application:
1):Secondary grouting installed compressors, pumps , punching machine, mill , ball mill , high -vibration equipment ,
2):Susceptible to chemical attack equipment foundation grouting area .
3):Track basis , bridges and other support base that is a strong pressure grouting area ,
4):Anchors , reinforced concrete structure planting and building reinforcement ,
5):Concrete, stone, steel, wood and other surface used as self-leveling mortar.
6):Iron , iron rods , rod steel connections.

Feature:
1):High strength, early strength : it can provide much better mechanical properties of cement-based materials, compression, adhesive , etc. , higher early strength .
2):Low exothermic peak value: May provide long reaches 120 minute (25℃) operating times, suits the great volume grouting use.
3):No shrinkage : to ensure that the final shape after filling layer in full contact with the bearing surface to ensure high -precision equipment was installed.
4):Excellent creep resistance : Epoxy grout can be alternately freezing and thawing in the long term -50 ℃ to + 80 ℃, poor physical conditions vibration pressure long-term use without plastic deformation , to ensure the long-term positioning device accurately .
5):Remarkable resilience : Epoxy grout can be resolved by the transfer of any movable device may make cement-based grout layer burst dynamic load .
6):Corrosion resistance: can withstand acid, alkali, salt , oil and other chemicals, long-term contact corrosion .

Product physical performance range (A + B): C≈1: 4 ( conforming to ASTM standards )

Physical properties

1d

3d

7d

Finally

Standards

Compressive Strength

50MPa 

65MPa 

95MPa 

100MPa 

GB/T50081-2002 

Flexural strength

10MPa 

15MPa 

20MPa 

25MPa 

Pullout strength

8MPa 

12MPa 

15MPa 

17MPa

Compression elastic membrane

18000MPa 

18500MPa 

Linear shrinkage

0.012% 

0.012% 

HG/T2625-94 

Exothermic peak

42℃ 

HG/T2625-94 

Compression Creep

1.0*103mm/mm(180d

GBJ82-85 

Thermal expansion coefficient

40*106mm/mm/℃

GBJ119-88 

 

Construction Technology:
A:Surface preparation

Concrete surface contact BYER-100 , need to chisel its solid surface laitance and expose the grassroots level, to ensure the grout surfaces are clean , dry and free of grease . Concrete joints grind 25mm thick outside edge of the bevelled edges to increase the edge of the grout and adhesive base area , the metal surface to be bonded should be no rust (up SSPC-SP6 finish requirements ) .
B:Moulding

Templates shall be strong , solid lap , its inside with grease , wax or paste PVC tape to facilitate the release ; for ease of pouring and installation filling funnel , filling side between the template and equipment leaving the base around at least 100mm distance and higher equipment 100mm above the floor . 25mm thick nailed a 45 ° angle moldings on the inside of the template filling level height in order to avoid placing body edge stress concentration.
C:Construction temperature

Ambient temperature including concrete base and air temperature , in order to obtain the best working condition , must be left for 24 hours at 15 ~ 25 ℃ environment before filling , and within the next 24 hours ambient temperature control in 15 ~ 32 ℃ construction , 20 ℃ is most appropriate. Summer construction to avoid the midday heat , when necessary, to build awning ; in winter when the temperature is low , should be set up in heated greenhouses filling area to ensure that the construction environment temperature is higher than 15 ℃, the construction should choose noon .
D:Mixing
1):With a hand-held blender (200 ~ 250rpm) mix A ( resin ), B ( hardener ) for about 3 minutes ;
2):In the low-speed high-power stirrer was added (15 ~ 20rpm) in C ( filler ) so that , B mixture is mixed with A, stir until all invasive orthopedic complete , about 5 to 10 minutes ; at low temperatures in order to ensure the mixture flow resistance, it can be appropriate to reduce the C ( filler ) in an amount ( up to 1/2 of the material can be reduced ) .
E:Filling
1):Filling should be filling one side to the other side ; filling process can be squeezed but do not vibrating to avoid the inclusion of air trapping wherein ; grouting distance is greater than 1.5m, use high filling funnel method , using gravity assisted filling the pressure principle . Grouting work must be completed as soon as continuous ;
2):You need to set a single filling control the thickness between 25mm to 350mm , filling area over 1.8m × 1.8m when filling in the area reserved for strip joints ; single bolt hole filling depth of up to 1500mm.

 

 Three component solvent-free epoxy resin grout modern epoxy grouting materialsThree component solvent-free epoxy resin grout modern epoxy grouting materialsThree component solvent-free epoxy resin grout modern epoxy grouting materials